Welcome to the Township of Marlboro, New Jersey
Township of Marlboro, New Jersey


















  

  

Town Hall
1979 Township Drive
Marlboro, NJ 07746
732-536-0200

 

What Construction Permits are Needed?

A CONSTRUCTION PERMIT, WHICH MAY INCLUDE A BUILDING, ELECTRICAL, FIRE AND/OR PLUMBING SUB-CODE TECHNICAL SECTION, IS REQUIRED TO DO ANY OF THE FOLLOWING:

ALL CONSTRUCTION, INCLUDING BUT NOT LIMITED TO:
(THE FOLLOWING IS A GENERAL GUIDE- EACH JOB MAY HAVE DIFFERENT REQUIREMENTS AND MAY NEED MORE THAN IS LISTED BELOW)
CONSTRUCTION PERMIT APPLICATIONS FOR PROJECTS WHICH CHANGE THE FOOTPRINT OF THE BUILDING, LOT COVERAGE, USE OF THE SPACE, ETC. MAY ALSO REQUIRE A ZONING APPROVAL (PERMIT). AN APPLICATION IS ENCLOSED WITH THE CONSTRUCTION PERMIT APPLICATION WHEN OBTAINED AT THE MARLBORO TOWNSHIP CONSTRUCTION DEPARTMENT OFFICE.

CATEGORY - PERMIT(S) NEEDED

ADDITIONS - All

NEW BUILDING - All

AIR CONDITIONING - Electric & Plumbing

PLUMBING WORKGAS PIPE - Plumbing

ALARMS
Burglar - Electric
Fire/Smoke/Carbon Monoxide - Electric & Fire

POOL - Building, Electric,
Gas Heater-Plumbing
Propane Heater-Plumbing & Fire

ALTERATIONS - Residential or Commercial – All & Zoning

PORCHBuilding, Zoning Electric if needed

ASBSETOS REMOVAL - Building

RADON - Building, Electric

BASEMENT REFINISHING/REMODELING - Building, Electrical, Fire and Plumbing

RAMPBuilding & Zoning

BATHROOM FIXTURES
Any piping changes – Plumbing   (need licensed plumbing contractor or homeowner)

ROOF - Building

CAR PORT - Building, Zoning others as needed

RAISED PATIOS- BUILDING and ELECTRIC, Zoning

CHIMNEY RELINE - Fire

SHED - Over 100 sq ft or over 10' high – Building, Zoning

DECKBuilding & zoning

SIDING - Building

DEMOLITIONBuilding- COULD BE ALL

SIGNS - Building, if needed,Electric

ELECTRIC WORK - Electric

FIRE SPRINKLER - Fire

ELEVATORElevator, Building, Electric, Fire

STEPS - Building

FENCE - Building & Zoning- If:
- around a pool or:
- over 6' or:
- commercial

STOVE WOODBURNING - Building, Fire

FIREPLACE - Building, Fire, Plumbing, Chimney Certification

TANK (installation, Plumbing & Fire
abandonment or removal) - Fire

GARAGEBuilding & Zoning - (others as needed)

TELEPHONE/COMM. POINTS/VOICE DATA/COMPUTER WIRING - Electric

GAZEBO - If over 100 sqft & <10’ high – Building & Zoning

TENANT FIT OUT - All

HEATING/VENT/AC (HVAC) - Electric (if fuel fired equip. does not need licensed electrician), Fire, Plumbing

TRAILER –CONSTRUCTION BUILDIN SALES  TRAILER- All & Zoning

HOOD - Fire & Electric

TEMPORARY MOBILE HOMEAll, Zoning

LAWN SPRINKLER - Electric, Plumbing

GAS WATER HEATERPlumbing

MOVING A STRUCTURE - Building Zoning and all utility sign-offs as for demo. Also would require footing/foundation application for setting the structure in new location.

WINDOWS - adding, enlarging, or eliminating - Building

NOTE

All contractors are required to provide this office with a current copy of Home Improvement Contractor Registration (HIC) or other License from the State of New Jersey for all work on residential property